Choose the quantity you need; pack contents are described in the product details.
Worthofbest
Worthofbest Emerald Green Rhinestone Bedazzling Kit — 33,000pcs 2–6mm with B7000 Glue & Picker
Check the exact product, pack and directions before ordering
Available to order with free standard UK delivery.
Free standard UK delivery with no minimum order.
Free shipping
iFree standard UK delivery. See shipping estimates and tracking details in our shipping policy.
Easy returns
iContact us for a free return label for eligible items within 30 days.
Peak-demand shipping delays
iDuring high demand, deliveries may experience short carrier delays. Tracking updates remain active for every order.
Email customer support
Email us about products, delivery or returns. We aim to reply within one business day.
Terms quick view
30-day returns for eligible items; see the return policy.
Orders include free shipping. Returns and service terms may vary by item eligibility and destination.
Product details
If you want to add sparkling green accents to clothing, accessories, home décor or party projects, this bulk rhinestone collection supplies a wide range of sizes and reliable adhesive to finish large-scale decorating tasks without repeated trips to the store. The kit is organized for fast selection, includes tools to speed application, and provides enough supply to cover apparel, shoes, tumblers and more.
How will this kit make decorating faster and neater?
The set comes pre-sorted in a sturdy 24-grid container so you can pick the exact size you need without mixing stones. A wax-tipped gem picker helps place each rhinestone precisely, and the B7000 glue’s fine metal nozzle enables controlled adhesive dots.
- 24-grid transparent case keeps sizes separated and visible
- Wax-tipped picker for accurate placement and less mess
- B7000 tubes with extra-fine tip for precise glue application
What surfaces and projects are these flatback gems suitable for?
Flatback resin rhinestones bond to most non-porous and many porous surfaces using the supplied clear adhesive, making them versatile for fashion, crafts and décor. They work well on fabric, plastic, glass, metal accents and paper with proper preparation and curing time.
- Ideal for garments, shoes, caps, and festival costumes
- Great for phone cases, bottles, tumblers and cosmetics
- Suitable for scrapbooking, greeting cards and craft projects
How durable is the glue and how long does it take to set?
B7000 adhesive included with the kit is formulated to dry clear and form a strong bond when allowed to cure. You’ll see initial set within about 10 minutes, but full strength improves over 48 hours, so allow proper cure time for items that will be handled frequently.
- Three 10ml tubes ensure enough adhesive for large projects
- Fast initial tack (approx. 10 minutes) with 48-hour full cure
- Metal tip and reinforced seam reduce clogging and leaking
How many sizes and facets are in this assortment, and why it matters?
The kit includes five sizes—2mm, 3mm, 4mm, 5mm and 6mm—so you can layer, outline or fill areas with scale-appropriate gems. Each rhinestone has multiple facets to catch light and increase visual sparkle without needing oversized stones.
- Five sizes for flexible design and dimension
- 14-facet cut for enhanced shine from many angles
- 33,000 pieces provide coverage for large or repeated projects
Who is this for? Crafters, costume designers, DIY gift makers and small business owners who need a generous supply of coordinated emerald green gems will find this kit practical and economical. It’s aimed at both beginners—because of the included tools and instructions—and experienced embellishers who require high quantities and dependable adhesive for steady workflows.
FAQ
Q: Are these rhinestones washable on clothing?
A: When glued correctly and fully cured for 48 hours, they hold up to gentle washing; hand wash or use a laundry bag for best results.
Q: Can I use B7000 glue on glass and plastic?
A: Yes, B7000 bonds well to glass and many plastics; ensure surfaces are clean and allow full cure for strongest hold.
Recently viewed products
Product quick view
Product
Added to cart





